On Fri, Jan 22, 2010 at 5:56 PM, Peter Saint-Andre <[email protected]>wrote:

> On 1/22/10 10:51 AM, Peter Mount wrote:
>
> > Just looking ahead - we'll be hitting that over the next few weeks, i.e.
> > section 10 is planned for week 5 and section 15 in week 6. I know we'll
> > be getting more like this with something as large as muc taking that
> long.
> >
> > For example I'm double checking something of my own over the weekend
> > which is in section 6 but probably needs talking about when we reach 18
> > (Schemas)
> >
> > As for muc#roomconfig_publicroom being a tristate i'm not sure. I can
> > see it being a boolean due to "public" 1 and "hidden" 0, but what affect
> > would having other values have with existing clients?
> >
> > Perhaps this one we should think through whilst we get through the next
> > set of sections. In Peter's plan its one week for each of the next four
> > sections (7-10).
>
> I don't mean to limit discussion at all by splitting things up, I just
> want to make sure that we don't try to review the whole thing at once!
> Feel free to raise issues like this at any time during the review.
>

I wasn't meaning to limit discussion, but with something this big I can see
it getting to the point where we end up going through several areas at
once... and as muc#roomconfig_publicroom is referenced here but defined
later then that gives us more time between now and then as I think that one
may not be as clear cut as just making it a tristate


> In particular, the schemas should be updated throughout the process so
> any fixes to the schemas are more of a sanity check at the end.
>

Ok, in that case I may have something tomorrow or Sunday for a problem I had
a while back and need to double check - relates to Result Set Management in
6.2

Peter

-- 
Peter Mount
e: [email protected]
w: http://retep.org
xmpp:[email protected] <xmpp%[email protected]>
MSN: [email protected]