Aias00 commented on PR #7346:
URL: https://github.com/apache/shenyu/pull/7346#issuecomment-5866959702

   Full-matrix benchmark completed successfully, but it exposes an important 
tradeoff:
   
   | Metric | Baseline | This PR | Change |
   | --- | ---: | ---: | ---: |
   | Total runner time | 93.6 min | 80.0 min | -13.5 min (-14.5%) |
   | Workflow wall time | 12m49s | 20m33s | +7m44s |
   
   All ten cases passed and the shared artifact chain is valid. The runner-time 
saving is real, but the serial prepare dependency increases PR feedback 
latency. This should be treated as a cost/capacity optimization, not a 
wall-clock speedup.
   
   Baseline: https://github.com/apache/shenyu/actions/runs/36374452513
   
   This PR: https://github.com/apache/shenyu/actions/runs/36399888086


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to