> Interleaving of build phases
> ----------------------------
>
> Key: MNG-7860
> URL: https://issues.apache.org/jira/browse/MNG-7860
> Project: Maven
> Issue Type: New Feature
> Reporter: Christoph Läubrich
> Assignee: Guillaume Nodet
> Priority: Major
>
> Currently a project is build bu running all its phases (e.g. [compile, test,
> package,
> verify|https://maven.apache.org/guides/introduction/introduction-to-the-lifecycle.html]).
> Lets say we have a multi module build with a module "lib" that contains the
> basic stuff so other modules depend on it (lets say "feature-a" and
> "feature-b") and of course we want everything is always fine so we have a lot
> of test in "lib" in compile scope.
> Currently now "lib" is compiled and "feature-a" and "feature-b" have to wait
> until it has finished all phases so in the worst a whole build-tree can be
> blocked from building unless "lib" is finished.
> *What I like to propose* is that there is a way to 'interleave' phases. For
> example currently 'package' is executed *after* test, but actually it could
> be performed before hands, also as soon as "lib" has passed its
> compile/package phase the other projects are allowed to run (because the
> artifact is already there even though not fully tested).
> Of course this is only a rough description of the idea, e.g. to make this
> work, one maybe want to have a new 'package-main' phase that is performed
> right after 'compile' (and probably a package-test phase) ....
--