Preparation goals 'clean integration-test' not sufficient for plugin-projects
-----------------------------------------------------------------------------

         Key: MRELEASE-102
         URL: http://jira.codehaus.org/browse/MRELEASE-102
     Project: Maven 2.x Release Plugin
        Type: Bug

    Versions: 2.0-beta-4, 2.0-beta-3    
    Reporter: Jens Zastrow


A multi-project build:

root
   L Project-A (plugin)
   L Project-B (jar) (B uses A as plugin)

To successfully build such a project-structure phase 'install' has to be called 
 - at least for the project A - to ensure there exists a plugin in the local 
repository with the correct name/group and VERSION wich is used during the same 
build from project B. 




-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
   http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see:
   http://www.atlassian.com/software/jira

Reply via email to