On 26/2/19 4:52 am, Joel Sherrill wrote: > To follow up, I built lm4f120 with OPERATION_COUNT=10 and the failure set > dropped to these: > > gmake[5]: *** [capture.exe] Error 1 > gmake[5]: *** [loopback.exe] Error 1 > gmake[5]: *** [block08.exe] Error 1 > gmake[5]: *** [top.exe] Error 1 > gmake[5]: *** [sp47.exe] Error 1 > gmake[5]: *** [sp71.exe] Error 1 > gmake[5]: *** [sptimecounter02.exe] Error 1 > gmake[5]: *** [sptimecounter03.exe] Error 1 > gmake[5]: *** [psxconfig01.exe] Error 1 > gmake[5]: *** [tm21.exe] Error 1 > gmake[5]: *** [tmcontext01.exe] Error 1 >
This looks better. What does the `OPERATION_COUNT` do to effect the link size? I am wondering how a change to a statically initialised workspace Sebastian raised and the OPERATION_COUNT interact. Chris _______________________________________________ devel mailing list devel@rtems.org http://lists.rtems.org/mailman/listinfo/devel