A current test run takes anywhere north of 30 minutes on a good machine. Much of that time is spent either rebuilding the hwdb or just waiting for various timeouts.
We run the tests in serial to avoid interference between the various udev rules. Running the current set in parallel has some interesting side effects (mostly the ID_INPUT_* labelling being wrong when the udev hwdb is refreshed at the wrong time). This set allows for parallel testing by: 03: moving all the tests into a single binary 04: dumping the udev rules in place once at start 09: forking off like crazy to run the variuos tests in different processes So we don't actually use parallel make check, we just do the parallel stuff ourselves. A normal test run is now down to about 3-4 min, a full suite hovers around 7-8 min. The tests are distributed by group name across the processes, I suspect some more time can be gained by better distribution (or even a test queue) but for now the reduction is pretty great anyway. Cheers, Peter _______________________________________________ wayland-devel mailing list [email protected] https://lists.freedesktop.org/mailman/listinfo/wayland-devel