My configuration is 2 Windows PCs (machine A and B), each running Outlook 2010 with CalDav synchroniser v3.6.2, connecting to a Sogo server v4.1.1.
Synchronisation mode is set to 'Outlook to server (two way)' on both, with a synchronisation interval of 1 minute. When a task is marked as 'completed' on machine A, instead of updating the state of the same task to 'completed' on machine B, a duplicate completed task is generated on machine B. On the next sync this duplicate gets replicated back to machine A and vice versa, resulting in an additional duplicate being generated on both machines every minute. Any solution to this problem would be welcome. -- [email protected] https://inverse.ca/sogo/lists
