On 18/03/2016 02:00, Miika Turkia wrote:

Well, it seems I get one minute longer dive if I dive within few minutes from a 
previous dive to 38 meters. And planning for 20 minutes at 40 meters. Sounds 
unbelievable short penalty from accummulated nitrogen, but indeed it looks like 
previous dives are taken into account, to some extent.

miika
___________
Here are plans from VPlanner for similar dives.

Using EAN28: 2 dives to 40m for 20 min

Dive 1:

Depth Stop Run Mix pO2 EADDes 40 - 2 28 - - Lvl 40 18 20 28 1.36 35 Asc 15 - 22 28 - - Stp 15 0:13 23 28 0.67 12 Stp 12 2:00 25 28 0.58 9 Stp 9 4:00 29 28 0.50 6 Stp 6 5:00 34 28 0.42 4 Stp 3 10 44 28 0.33 1 Sfc - - 44 28 - -

Dive# 1,  VPM-B  +3
Elevation = 975 m
CNS = 13%
OTU's = 33
Gas  28 = 2887 ltr.

Surface interval: 20 min

Dive 2:

Depth Stop Run Mix pO2 EADDes 40 - 2 28 - - Lvl 40 18 20 28 1.36 35 Asc 18 - 22 28 - - Stp 18 0:33 23 28 0.75 14 Stp 15 2:00 25 28 0.67 12 Stp 12 3:00 28 28 0.58 9 Stp 9 4:00 32 28 0.50 6 Stp 6 9:00 41 28 0.42 4 Stp 3 23 64 28 0.33 1 Sfc - - 64 28 - -

Dive# 2,  VPM-B  +3
Elevation = 975 m
Surface interval 0d  0h 20m
CNS = 25%
OTU's = 34
Gas  28 = 3342 ltr.
Decozone start = 24 m

Using Subsurface *4.5.2.1083:*

Dive 1:

Subsurface dive plan based on VPM-B at +4 conservatism

depth

        

duration

        

runtime

        

gas

40m

        

2min

        

2min

        

EAN28

40m

        

18min

        

20min

        

15m

        

3min

        

23min

        

15m

        

1min

        

24min

        

12m

        

1min

        

25min

        

12m

        

2min

        

26min

        

9m

        

1min

        

27min

        

9m

        

3min

        

29min

        

6m

        

1min

        

30min

        

6m

        

6min

        

35min

        

3m

        

1min

        

36min

        

3m

        

10min

        

45min

        

0m

        

1min

        

46min

        

CNS: 15% OTU: 41

Gas consumption: 2942ℓ/123bar of EAN28 (748ℓ/31bar in planned ascent)


20 min surface interval

Dive2:

Subsurface dive plan based on VPM-B at +4 conservatism

depth

        

duration

        

runtime

        

gas

40m

        

2min

        

2min

        

EAN28

40m

        

18min

        

20min

        

15m

        

3min

        

23min

        

15m

        

1min

        

24min

        

12m

        

1min

        

25min

        

12m

        

3min

        

27min

        

9m

        

1min

        

28min

        

9m

        

4min

        

31min

        

6m

        

1min

        

32min

        

6m

        

8min

        

39min

        

3m

        

1min

        

40min

        

3m

        

20min

        

59min

        

0m

        

1min

        

60min

        

CNS: 15% OTU: 41

Gas consumption:

3266ℓ/136bar of EAN28 (1072ℓ/45bar in planned ascent)


Hope the formatting of above holds on your email system.
Reasonably similar??
Kind regards,
wf



_______________________________________________
subsurface mailing list
[email protected]
http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface

Reply via email to