Hi, After the commit, my optimize usually takes 20 minutes. The thing is that I need to know programatically if the optimization has completed or not. Is there an API call through which I can know the status of optimization?
*Pranav Prakash* "temet nosce" Twitter <http://twitter.com/pranavprakash> | Blog <http://blog.myblive.com> | Google <http://www.google.com/profiles/pranny>