Hi Tommaso,

On Nov 30, 2010, at 7:41am, Tommaso Teofili wrote:

Hi all,

in a replication environment if the host where the master is running goes down for some reason, is there a way to communicate to the slaves to point to a different (backup) master without manually changing configuration (and
restarting the slaves or their cores)?

Basically I'd like to be able to change the replication master dinamically
inside the slaves.

Do you have any idea of how this could be achieved?

One common approach is to use VIP (virtual IP) support provided by load balancers.

Your slaves are configured to use a VIP to talk to the master, so that it's easy to dynamically change which master they use, via updates to the load balancer config.

-- Ken

--------------------------
Ken Krugler
+1 530-210-6378
http://bixolabs.com
e l a s t i c   w e b   m i n i n g





Reply via email to