On 22-10-2021 14:45, BELLENCONTRE, FREDERIC wrote:
I want to know on each node  the  job that will terminate the latest and get the planed date of completion ( it corresponds to the date when we could pass from draining status to drained status if no new jobs and no premature end) -eventually filtered by partition, node state, on specific list of nodes-

The pestat script from https://github.com/OleHolmNielsen/Slurm_tools/tree/master/pestat allows something like this by using this pestat option:

 -E: Job EndTime is printed after each jobid/user.
     Hint: Pipe output through "sort -k 11" to sort the EndTimes.

The other pestat options allow all sorts of filtering.

/Ole