RE: January 2018 Podling Report draft

2018-01-01 Thread constantin drabo
ielenga Envoyé : dimanche 31 décembre 2017 02:03 À : us...@netbeans.incubator.apache.org Objet : January 2018 Podling Report draft Hi all, Periodically (every 4 months after the first 3 months), podlings (i.e., projects that are in the Apache incubator) need to provide a status report. https://

January 2018 Podling Report draft

2017-12-31 Thread Geertjan Wielenga
Hi all, Periodically (every 4 months after the first 3 months), podlings (i.e., projects that are in the Apache incubator) need to provide a status report. https://wiki.apache.org/incubator/January2018 Above is the report for January 2018, where we need to provide our status, since it's 4 months