ielenga
Envoyé : dimanche 31 décembre 2017 02:03
À : us...@netbeans.incubator.apache.org
Objet : January 2018 Podling Report draft
Hi all,
Periodically (every 4 months after the first 3 months), podlings
(i.e., projects that are in the Apache incubator) need to provide a
status report.
https://
Hi all,
Periodically (every 4 months after the first 3 months), podlings
(i.e., projects that are in the Apache incubator) need to provide a
status report.
https://wiki.apache.org/incubator/January2018
Above is the report for January 2018, where we need to provide our
status, since it's 4 months