[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-03-11 Thread Launchpad Bug Tracker
This bug was fixed in the package linux-firmware - 20240318.git3b128b60-0ubuntu2.10 --- linux-firmware (20240318.git3b128b60-0ubuntu2.10) noble; urgency=medium * [SRU] Introduce support for RTL8125BPH 2.5 GbE controller. (LP: #2092384) - rtl_nic: add firmware rtl8125bp-2 * Wit

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-03-10 Thread En-Wei Wu
Hi @ahasenack and @juergh, I just tested Nobel 6.8.0-53-generic with linux-firwmare 20240318.git3b128b60-0ubuntu2.10 and it's verified without issue. ** Tags removed: verification-needed-noble ** Tags added: verification-done-noble -- You received this bug notification because you are a member o

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-03-06 Thread Juerg Haefliger
@ahasenack This bug was initially fixed in Noble 20240318.git3b128b60-0ubuntu2.8 which @rickywu verified. We then reverted the fix in 2.9 for the point release and brought it back in 2.10. The 2.8 and 2.10 packages are identical except for the changelog. From my perspective his verification of 2.8

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-03-06 Thread Launchpad Bug Tracker
This bug was fixed in the package linux-firmware - 20240913.gita34e7a5f-0ubuntu2.5 --- linux-firmware (20240913.gita34e7a5f-0ubuntu2.5) oracular; urgency=medium * [SRU] Introduce support for RTL8125BPH 2.5 GbE controller. (LP: #2092384) - rtl_nic: add firmware rtl8125bp-2 * Wi

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-03-06 Thread Andreas Hasenack
Hi @rickywu, in comment #5 you wrote: > 1. Noble 6.8.0-53-generic with linux-firmware > 20240318.git3b128b60-0ubuntu2.8. It worked fine without any > problem. That is not the correct version of linux-firmware from noble-proposed. noble-proposed has 20240318.git3b128b60-0ubuntu2.10, and noble-up

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-02-25 Thread En-Wei Wu
I've tested: 1. Noble 6.8.0-53-generic with linux-firmware 20240318.git3b128b60-0ubuntu2.8. It worked fine without any problem. 2. Oracular with linux-firmware 20240913.gita34e7a5f-0ubuntu2.5. It also worked fine. -- You received this bug notification because you are a member of Ubuntu Bugs, w

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-02-25 Thread En-Wei Wu
** Tags removed: verification-needed-noble verification-needed-oracular ** Tags added: verification-done-noble verification-done-oracular -- You received this bug notification because you are a member of Ubuntu Bugs, which is subscribed to Ubuntu. https://bugs.launchpad.net/bugs/2095279 Title:

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-02-18 Thread Viral Wang
** Tags added: verification-needed-noble verification-needed-oracular -- You received this bug notification because you are a member of Ubuntu Bugs, which is subscribed to Ubuntu. https://bugs.launchpad.net/bugs/2095279 Title: MT7925 controller timeout during Suspend stress test To manage not

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-02-12 Thread En-Wei Wu
** Tags removed: verification-needed-noble-linux-oem-6.11 ** Tags added: verification-done-noble-linux-oem-6.11 -- You received this bug notification because you are a member of Ubuntu Bugs, which is subscribed to Ubuntu. https://bugs.launchpad.net/bugs/2095279 Title: MT7925 controller timeout

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-01-31 Thread Juerg Haefliger
** Changed in: linux-firmware (Ubuntu Noble) Status: New => Fix Committed ** Changed in: linux-firmware (Ubuntu Oracular) Status: New => Fix Committed ** Changed in: linux-firmware (Ubuntu Plucky) Status: New => Fix Released -- You received this bug notification because you

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-01-25 Thread Ubuntu Kernel Bot
This bug is awaiting verification that the linux-oem-6.11/6.11.0-1014.14 kernel in -proposed solves the problem. Please test the kernel and update this bug with the results. If the problem is solved, change the tag 'verification-needed-noble-linux-oem-6.11' to 'verification-done- noble-linux-oem-6.

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-01-24 Thread LEE KUAN-YING
** Changed in: linux-oem-6.11 (Ubuntu Noble) Status: New => Fix Committed -- You received this bug notification because you are a member of Ubuntu Bugs, which is subscribed to Ubuntu. https://bugs.launchpad.net/bugs/2095279 Title: MT7925 controller timeout during Suspend stress test To

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-01-19 Thread En-Wei Wu
** Also affects: linux (Ubuntu Oracular) Importance: Undecided Status: New ** Also affects: linux-firmware (Ubuntu Oracular) Importance: Undecided Status: New ** Also affects: linux-oem-6.11 (Ubuntu Oracular) Importance: Undecided Status: New ** Also affects: linux

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-01-19 Thread En-Wei Wu
** Tags added: jira-wtn-183 oem-priority ** Description changed: [Impact] When doing suspend test, the system will fail to be suspended since the MT7925 controller couldn't be suspended. The root cause is caused by the command timeout issued from mt7925 driver. [Fix] Cherry-pick the

[Bug 2095279] Re: MT7925 controller timeout during Suspend stress test

2025-01-19 Thread En-Wei Wu
** Also affects: linux-oem-6.11 (Ubuntu) Importance: Undecided Status: New ** Also affects: linux (Ubuntu Noble) Importance: Undecided Status: New ** Also affects: linux-oem-6.11 (Ubuntu Noble) Importance: Undecided Status: New ** Changed in: linux (Ubuntu) S