Many thanks Jeff,
Le samedi 7 avril 2018 à 07:21:31 UTC+2, Jeff Newmiller
a écrit :
You need to pay attention to the documentation more closely. If you don't
know what something means, that is usually a signal that you need to study
more... in this case about the difference between
You need to pay attention to the documentation more closely. If you don't
know what something means, that is usually a signal that you need to study
more... in this case about the difference between an input variable and a
design (model) matrix. This is a concept from the standard linear algebra
R-experts,
I have fitted many different lines. The fast-tau estimator (yellow line) seems
strange to me because this yellow line is not at all in agreement with the
other lines (reverse slope, I mean the yellow line has a positive slope and the
other ones have negative slope).
Is there somethi
3 matches
Mail list logo