== Progress ==
* Two days holiday
* Toolchain (CARD-862 2/6)
- http://llvm.org/PR20700 (-Wa,-mfpu in IAS) WIP
- http://llvm.org/PR20702 (vadd #imm, fix vbic) FIXED
* Background (4/6)
- Code review, meetings, discussions, etc.
- Catching up with reviews & emails post-connect
== Plan ==
* Co
Short week, 2 days holiday (4/10)
== Progress ==
* GCC trunk/4.9 cross-validation (2/10)
- reported a few new FAILs
- trying to allocate time to fix new FAILs introduced in the 4.9
branch on devirt-28a.C, mostly because a testsuite configuration
problem.
- fixed reporting of email-driven va
== Progress ==
* Connect recovery [4/10]
* NEON load/stores (TCWG-516 [5/10])
. initial review of my vldN_lane asm()->__builtin patches is promising
. the other patches for other loads/stores are wrong. Have been investigating
(with upstream) how much bigger the can of worms is.
* Misc [1/10]