[ACTIVITY] Week 39

2014-09-26 Thread Renato Golin
== Progress == * Two days holiday * Toolchain (CARD-862 2/6) - http://llvm.org/PR20700 (-Wa,-mfpu in IAS) WIP - http://llvm.org/PR20702 (vadd #imm, fix vbic) FIXED * Background (4/6) - Code review, meetings, discussions, etc. - Catching up with reviews & emails post-connect == Plan == * Co

[ACTIVITY] 22-26 Sept 2014

2014-09-26 Thread Christophe Lyon
Short week, 2 days holiday (4/10) == Progress == * GCC trunk/4.9 cross-validation (2/10) - reported a few new FAILs - trying to allocate time to fix new FAILs introduced in the 4.9 branch on devirt-28a.C, mostly because a testsuite configuration problem. - fixed reporting of email-driven va

[ACTIVITY] Week 39

2014-09-26 Thread Charles Baylis
== Progress == * Connect recovery [4/10] * NEON load/stores (TCWG-516 [5/10]) . initial review of my vldN_lane asm()->__builtin patches is promising . the other patches for other loads/stores are wrong. Have been investigating (with upstream) how much bigger the can of worms is. * Misc [1/10]