Hi!
> Jani: what is the problem with that calendar interval's present length ?
We need ~13 weeks (real working time) from the feature freeze to the final
release. Currently we have holidays during that period and so on we need to
reserve much longer calendar time for that. E.g. with Qt 6.5 this
I think one of the considerations of releasing March and Septemper was to have
a chance to be considered for Ubuntu's April and October releases.
I'm not sure if I remember correctly, though, and also not if that had the
desired effect (if it was a reason in the first place).
++ Eike
> Am 05/12