Stefano Zacchiroli (03/03/2010):
> No problem, in case you want to look at it more in details and you
> need more time just let me know and I'll reschedule the NMU (or
> cancel it, FWIW).
That's OK, I'm currently building the (hopefully) final
package. Thanks again.
Mraw,
KiBi.
signature.asc
D
On Wed, Mar 03, 2010 at 04:57:17PM +0100, Cyril Brulebois wrote:
> I planned to look into ccsm's bugs a few days ago, but got tricked
> into -intel's bugs. I'll try and look into merging your diff directly
> in the git repository, or let the NMU get uploaded after the delay if
> I fail to do so.
N
Stefano Zacchiroli (03/03/2010):
> Dear maintainer,
Hi Stefano,
> I've prepared an NMU for ccsm (versioned as 0.8.4-1.1) and uploaded
> it to DELAYED/3. Please feel free to tell me if I should delay it
> longer.
I planned to look into ccsm's bugs a few days ago, but got tricked
into -intel's bu
tags 547810 + pending
thanks
Dear maintainer,
I've prepared an NMU for ccsm (versioned as 0.8.4-1.1) and uploaded it
to DELAYED/3. Please feel free to tell me if I should delay it longer.
The patch is the one proposed, but using "*-packages" to be more
resilient to changes.
Regards.
--
Stefan
4 matches
Mail list logo