Hi,
I'm happy to make whatever changes are necessary to this package, but I'm
not sure what is gained by providing Breaks for every potential package
affected by a bouncycastle upgrade. It seems to me more proper that if
package X depends on bouncycastle = version Y (which appears to be the case
Hi Thomas,
We're more than happy to hand over GWT at this point. I was trying to
get all the GWT bindings for guava done before doing so, but I think
I'm at a good place with that now too and should have them packaged by
the end of the week if all goes well.
Chris may be working on this bug:
ht
There is a an upstream bug which prevents me from actually fixing the
package in a sane way to allow building with libxml2 rather than
guththila (I reported it upstream and copied you on it), but I have
attached a patch that will allow you to build it for yourself.
Regards,
Brian
axis2c_1.6.0-4
3 matches
Mail list logo