[ACTIVITY] Week 39
== Progress == * Two days holiday * Toolchain (CARD-862 2/6) - http://llvm.org/PR20700 (-Wa,-mfpu in IAS) WIP - http://llvm.org/PR20702 (vadd #imm, fix vbic) FIXED * Background (4/6) - Code review, meetings, discussions, etc. - Catching up with reviews & emails post-connect == Plan == * Continue -Wa,-mfpu implementation in IAS * Start implementing fpu stuff in assembler * Fix the Compiler-RT buildbot * Add libc++abi buildbot ___ linaro-toolchain mailing list linaro-toolchain@lists.linaro.org http://lists.linaro.org/mailman/listinfo/linaro-toolchain
[ACTIVITY] 22-26 Sept 2014
Short week, 2 days holiday (4/10) == Progress == * GCC trunk/4.9 cross-validation (2/10) - reported a few new FAILs - trying to allocate time to fix new FAILs introduced in the 4.9 branch on devirt-28a.C, mostly because a testsuite configuration problem. - fixed reporting of email-driven validations * AArch64 libsanitizer - finally committed asan+ubsan support for AArch64! * Misc (4/10) * email catch-up * calls/meetings * updated backports speadsheet, backlog now > 75 * bugzilla management == Next == * GCC trunk/4.9 cross-validation: - actually reproduce+propose fixes for a couple of regressions recently observed * AArch64 thread sanitizer * Neon intrinsic tests * Analyze failures in Backport job in Jenkins * Analyze differences in validation results between using shared libs and static libs ___ linaro-toolchain mailing list linaro-toolchain@lists.linaro.org http://lists.linaro.org/mailman/listinfo/linaro-toolchain
[ACTIVITY] Week 39
== Progress == * Connect recovery [4/10] * NEON load/stores (TCWG-516 [5/10]) . initial review of my vldN_lane asm()->__builtin patches is promising . the other patches for other loads/stores are wrong. Have been investigating (with upstream) how much bigger the can of worms is. * Misc [1/10] . LCA15 travel . bug investigation (#405) == Plan == * more NEON load/store ___ linaro-toolchain mailing list linaro-toolchain@lists.linaro.org http://lists.linaro.org/mailman/listinfo/linaro-toolchain