Re: KVM integration output page

2012-05-25 Thread Peter Maydell
On 24 May 2012 03:45, Michael Hope  wrote:
> Hi Peter, Riku.  I've written up a page covering the KVM integration
> work done this quarter at:
>  https://wiki.linaro.org/WorkingGroups/ToolChain/Outputs/KVMIntegration
>
> Could you review it please, including the instructions at:
>  https://wiki.linaro.org/WorkingGroups/ToolChain/Outputs/KVMIntegration/Quickstart

Looks OK to me; I haven't been able to go through all the instructions
though because I ran into the Fast Models networking-stalls bug.

-- PMM

___
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain


[ACTIVITY] weekly status

2012-05-25 Thread Ken Werner

Hi,

OpenEmbedded-Core/meta-linaro:
 * cbuild enhancements:
   * debugged failures till I noticed cbuild was pulling in the wrong 
branch of meta-linaro (now fixed)

   * added support for checking the oe-core build prerequisites
   * the images are now automatically bootet using qemu
   * sizes of the images and package sizes are now recorded
 * update to Linaro GCC 4.6 2012.05 (denzil) and Linaro GCC 4.7 2012.05 
(master)
 * debugged build failure when using Linaro GCC 4.6 in a hard float 
configuration
   * turns out that OE expects the GCC to respect the 
ARCH_FLAGS_FOR_TARGET env variable

 to build libgcc and friends properly for the given target
 (another missing patch to build the GCC the OE-Core way)
   * fix tested and checked in (denzil)
 * created/updated wiki pages:

https://wiki.linaro.org/WorkingGroups/ToolChain/Outputs/OpenEmbedded-Core
   https://wiki.linaro.org/KenWerner/Sandbox/OpenEmbedded-Core

Regards,
Ken

___
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain


[ACTIVITY] report week 21

2012-05-25 Thread Peter Maydell
Current Milestones:
||  || Planned|| Estimate   || Actual ||
||cp15-rework   || 2012-01-06 || 2012-06-23 ||||

 == other ==
  * preparation for Connect
  * wrote up and sent out proposal about handling TrustZone for KVM
  * investigated some issues Riku found when testing his packaged
version of KVM (one model issue, one kernel-too-old issue)
  * usual upstream maintainer duties

-- PMM

___
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain


[ACTIVITY] May 21 - May 25

2012-05-25 Thread Ulrich Weigand

== GCC ==

 * Followed up on review comments on reassociation pass.

 * Analyzed performance headroom of Linaro GCC 4.7 compared
   to various other compilers and identified several missing
   optimisations.

== Misc ==

 * Prepared for Linaro Connect Hong Kong.


Mit freundlichen Gruessen / Best Regards

Ulrich Weigand

--
  Dr. Ulrich Weigand | Phone: +49-7031/16-3727
  STSM, GNU compiler and toolchain for Linux on System z and Cell/B.E.
  IBM Deutschland Research & Development GmbH
  Vorsitzender des Aufsichtsrats: Martin Jetter | Geschäftsführung: Dirk
Wittkopp
  Sitz der Gesellschaft: Böblingen | Registergericht: Amtsgericht
Stuttgart, HRB 243294


___
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain


[ACTIVITY] 21st - 25th May

2012-05-25 Thread Andrew Stubbs

Committed my core-shifts patch into Linaro GCC.

Checked and posted my (newly rebased) neon-shifts patch upstream for review.

Continued work on my brain-dump of work in progress. Cleaned up, tested 
and posted example testcases and before/after compiler output for all my 
work-in-progress patches.


Looked at LaunchPad bug #851258. It's a miss-optimization bug that would 
take some effort to fix.


Discovered that my lower-subreg build had failed due to Werror. Fixed 
the warning, reuploaded the sources, and relaunched the build.


Prepared for travel to Connect.



___
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain


[Activity ] Week 21

2012-05-25 Thread Ramana Radhakrishnan
Progress

* Fixed PR53334 upstream - something that broke eembc builds.
* Usual meetings.
* Work through some of the speed tickets and upstream bugzilla perf
tickets in preparation for connect.
* Prepared for connect. Looked through some open issues and
investigating PR48941 patch. Uli and I had some discussions around the
patches for this and I had an idea later this evening to try out
something with __builtin_shuffle which certainly looks interesting and
is effectively what we came up with . It's probably better to use
__builtin_shuffle rather than inventing something on our own. In the
process found a bug with automatic rev generation from vec_perm
expressions and that should now be fixed.

* Worked through the auto-inc-dec stuff. Still needs some work and
looks unlikely to complete before connect and that's something I need
to keep working through.
* Prepared for connect.

Plans

*  Connect next week !



Absences:

28 May - 1 June : Linaro Connect

___
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain