I am attempting to calibrate a forest growth model using FME. I have
several spatially separate plots with time series growth data for
each(eg, height, basal area, etc.). Thus 2 independent variables: time
and plot.
Is there a way that I can calculate a model cost that takes into account
these different plots? I notice in the documentation for the modCost
function that there is a note stating that using more than one
independent variable should be possible in the future, and was wondering
if anyone has managed this? Or if there is a way I can achieve this, it
would be interesting to know how.
Thanks,
Jack
--
The University of Edinburgh is a charitable body, registered in
Scotland, with registration number SC005336.
______________________________________________
R-help@r-project.org mailing list
https://stat.ethz.ch/mailman/listinfo/r-help
PLEASE do read the posting guide http://www.R-project.org/posting-guide.html
and provide commented, minimal, self-contained, reproducible code.