Thanks that worked perfectly. One thing if I may. Is it possible to make the center dot red and the lines connecting the dots black?
Thanks, Chris On Jul 7, 2011, at 5:10 PM, Abhijit Dasgupta, PhD wrote: > You can easily do this by: > > qplot(x=as.factor(sch),y=est, geom='point', colour='red') + > geom_pointrange(aes(x=as.factor(sch), y=est, ymin=lower.95ci, > ymax=upper.95ci))+ > xlab('School') + ylab("Value-added")+theme_bw() > > > > > On 07/07/2011 05:55 PM, Christopher Desjardins wrote: >> Hi, >> I have the following data: >> >>> est >> sch190 sch107 sch290 sch256 sch287 sch130 >> sch139 >> 4.16656026 2.64306071 4.22579866 6.12024789 4.49624748 11.12799127 >> 1.17353917 >> sch140 sch282 sch161 sch193 sch156 sch288 >> sch352 >> 3.48197696 -0.29659410 -1.99194986 10.23489859 7.77342138 6.77624539 >> 9.66795001 >> sch368 sch225 sch301 sch105 sch353 sch291 >> sch179 >> 7.20229569 4.41989204 5.61586860 5.99460203 -2.65019242 -9.42614560 >> -0.25874193 >> sch134 sch135 sch324 sch360 bb1 >> 3.26432479 10.52555091 -0.09637968 2.49668858 -3.24173545 >> >>> se >> sch190 sch107 sch290 sch256 sch287 sch130 sch139 >> sch140 >> 3.165127 3.710750 4.680911 6.335386 3.896302 4.907679 4.426284 >> 4.266303 >> sch282 sch161 sch193 sch156 sch288 sch352 sch368 >> sch225 >> 3.303747 4.550193 3.995261 5.787374 5.017278 7.820763 7.253183 >> 4.483988 >> sch301 sch105 sch353 sch291 sch179 sch134 sch135 >> sch324 >> 4.076570 7.564359 10.456522 5.705474 4.247927 5.671536 10.567093 >> 4.138356 >> sch360 bb1 >> 4.943779 1.935142 >> >>> sch >> [1] "190" "107" "290" "256" "287" "130" "139" "140" "282" "161" "193" "156" >> "288" >> [14] "352" "368" "225" "301" "105" "353" "291" "179" "134" "135" "324" "360" >> "BB" >> >> >> From this data I have created 95% confidence intervals assuming a normal >> distribution. >> >> lower.95ci<- est - se*qnorm(.975) >> upper.95ci<- est + se*qnorm(.975) >> >> What I'd like to do is plot the estimate (est) and have lines attach to the >> points located in lower.95ci and upper.95ci. Presently I am doing the >> following: >> >> qplot(x=as.factor(sch),y=lower.95ci) + >> geom_point(aes(x=as.factor(sch),y=upper.95ci),colour="black") + >> geom_point(aes(x=as.factor(sch), y=est),colour="red") + ylab("Value-Added") >> + xlab("School") + theme_bw() >> >> Which creates this graph ---> >> http://dl.dropbox.com/u/1501309/value_added_test.pdf >> >> That's fine except that it doesn't connect the points vertically. Does >> anyone know how I could make the 'black' points connect to the 'red' point, >> i.e. show confidence bands? >> >> Thanks, >> Chris >> >> >> [[alternative HTML version deleted]] >> >> ______________________________________________ >> R-help@r-project.org mailing list >> https://stat.ethz.ch/mailman/listinfo/r-help >> PLEASE do read the posting guide http://www.R-project.org/posting-guide.html >> and provide commented, minimal, self-contained, reproducible code. ______________________________________________ R-help@r-project.org mailing list https://stat.ethz.ch/mailman/listinfo/r-help PLEASE do read the posting guide http://www.R-project.org/posting-guide.html and provide commented, minimal, self-contained, reproducible code.