Andy,

Thanks for the reply.  I had no idea I could combine them back ... that
actually will work pretty well.  We can have several "worker threads" load
up the RF's on different machines and/or cores, and then re-assemble them. 
RMPI might be an option down the road, but would be a bit of overhead for us
now.

Using the method of combine() ... I was able to drastically reduce the
amount of time to build randomForest objects.  IE, using about 25,000 rows
(6 columns), it takes maybe 5 minutes on my laptop.  Using 5 randomForest
objects (each with 5k rows), and then combining them, takes < 1 minute.

--
Anthony
-- 
View this message in context: 
http://r.789695.n4.nabble.com/randomForest-speed-improvements-tp3172523p3174621.html
Sent from the R help mailing list archive at Nabble.com.

______________________________________________
R-help@r-project.org mailing list
https://stat.ethz.ch/mailman/listinfo/r-help
PLEASE do read the posting guide http://www.R-project.org/posting-guide.html
and provide commented, minimal, self-contained, reproducible code.

Reply via email to