On 09/19/2012 09:22 AM, Duncan Murdoch wrote:
I understand the issue with time constraints on checks, and I think there are
discussions
in progress about that. My suggestion has been to put in place a way for a
tester to say
that checks need to be run within a tight time limit, and CRAN as tester will
do that in
cases where it cares about the timing.
Sounds good.
But even with the current (or past, it may have changed already) behaviour of
tight limits
for CRAN testing, you can put in code in your package that allows for longer
tests in
certain conditions. You'll run them, and if you advertise them, others will run
them too.
For me this applies to certain vignettes. Thanks to a pointer from K Hansen, I'm told I
can handle this by putting the long one in inst/doc and the short ones in vignettes.
I'll be trying this out soon.
Duncan Murdoch
______________________________________________
R-devel@r-project.org mailing list
https://stat.ethz.ch/mailman/listinfo/r-devel