On Friday 01 May 2009, Rob Scheepmaker wrote: > Hello all, > > I would like in discuss what things should still be improved to the way > jobs are handled in the systemtray before the freeze. These are some of the > things I noticed or are often requested: > > * Auto hiding after the dialog with jobs and notifications get's > automatically shown because one get's added. Currently this is hardcoded to > 6 seconds, but there are quite some requests for having no auto hiding at > all. I do very much prefer autohiding, since you can continue working > without having to close the popup manually when you start a longer running > job. However, some people prefer no autohiding because they have their > systray on a second monitor for example, so it doesn't really block their > workflow. I therefore suggest adding a config option to the systray, to > configure the autohiding time. no another configuratio option makes no sense, i think autohiding is ok now that the icon is animated (intuitive enough? needs real testing i suppose) speaking of the animated icon, it seems that the text is hardcoded to white? (not really happy with the look of it, but i don't know how to do it better without tons of custom graphics...) > > * I don't like having to clear the list of completed downloads whenever I > want a clean systray, and I think having the completed job extenderitems > automatically destroyed after a certain time could make sense. However, > what would be a sensible timelimit? 5 minutes? and hour? a day? I would > also hate if it would require an extra config option. This is the issue I'm > most uncertain of. yeah, they should have even a pretty short lifetime, 1-2 minutes? > > * Currently we just look at the second label, check if that's a filename > (all kio jobs have destination as second label, if there is a destination), > and use that to provide the possibility of opening the completed file. To > do this properly so an action can be provided for every kjob, this > possibility needs to be added to kjob/jobview dbus interface, but I think > that's more something for 4.4. Anyway, this approach has the following > problems: > > ** when copying multiple files, you will only be able to open the file last > copied. Possible solution here would be to check if there amount of files > copied is bigger then 1, and provide opening the destination folder instead > of the file in that case. what about always just provide the action to open the destination folder? seems more useful? > > ** I don't like the labels in the completed job's widget. Something like > "Dolphin finished copying 5 files" as message would be prettier, but that > would also be something that has to be added to kjob/jobview. (I'm not > really sure infomessage is really meant for that) yeah, or maybe even omit "Dolphin" :p > > These are the main issues I encountered. Please try the systray from trunk > some time and give your feedback on these issues or provide your own > points. > > Regards, > Rob > _______________________________________________ > Plasma-devel mailing list > Plasma-devel@kde.org > https://mail.kde.org/mailman/listinfo/plasma-devel
_______________________________________________ Plasma-devel mailing list Plasma-devel@kde.org https://mail.kde.org/mailman/listinfo/plasma-devel