Current Dev Position: YP 2.3 M4

Next Deadline: YP 2.3 M4 Cutoff is April 10, 2017


*** FEATURE FREEZE for 2.3 is now in effect. ***


SWAT team rotation: Stephano -> Maxin on Mar. 31, 2017.

SWAT team rotation: Maxin -> Cal on April 7, 2017.

https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

·        YP 2.3 M3 rc2 is in QA.  The live status is at: 
https://wiki.yoctoproject.org/wiki/2.3_QA_Status#Summary_Report

·        Unfortunately QA have run into issues running some tests where PR 
Server log output is corrupting the test results (bug 11284) caused by some of 
the tinfoil logging changes. We’re hoping to be able to work around this for 
the current QA run since its currently blocking many tests.

·        We also continue to see a large number of issues around sysroot tools 
like runqemu after the recipe specific sysroot changes which continue to be 
worked upon, particularly with interactions like other code, e.g. rm_work.

·        On a positive note, the autobuilder performance does seem to be much 
improved now we’ve identified some performance issues in a number of areas 
including the tests themselves.

·        Patches continue to flow at a high rate into the branch but we are 
going to have to start being more selective about which patches improve 
stability/quality as some fixes are introducing regressions and defects in 
submitted patches continue to take up a lot of review and testing time.

·        Since we’re into the stabilization phase of 2.3, planning for 2.4 has 
begun and we’re entering 2.4 ideas and enhancements in to bugzilla. If you have 
suggestions for 2.4, please ensure they are in bugzilla.


Proposed upcoming dot releases:

YP 2.1.3 Cut off May 15, 2017

YP 2.1.3 Release by May 26, 2017

YP 2.2.2 Cut off May 29, 2017

YP 2.2.2 Release by June 9, 2017


Key YP 2.3 Dates:

YP 2.3 M3 Release is Mar. 10, 2017 (Will be a few weeks late.)

YP 2.3 M4 Cutoff is April 10, 2017

YP 2.3 M4 Release is May 5, 2017


Tracking Metrics:

            WDD 2691 (last week 2832)

(https://wiki.yoctoproject.org/charts/combo.html)


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.3_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.3_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.3_Features

[If anyone has suggestions for other information you’d like to see on this 
weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Program Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
•   Work Telephone:        (503) 712-0534
•    Cell:               (208) 244-4460
• Email:                            [email protected]

-- 
_______________________________________________
Openembedded-core mailing list
[email protected]
http://lists.openembedded.org/mailman/listinfo/openembedded-core

Reply via email to