Yashwant Dhakad created OFBIZ-13246:
---------------------------------------
Summary: Automate creation of production runs from approved
internal requirements in the Manufacturing module
Key: OFBIZ-13246
URL: https://issues.apache.org/jira/browse/OFBIZ-13246
Project: OFBiz
Issue Type: Improvement
Components: manufacturing
Affects Versions: Upcoming Branch
Reporter: Yashwant Dhakad
In the Manufacturing module, when an internal requirement is approved, the
system doesn’t automatically create the related production run. Instead, users
have to manually go back to the manufacturing screen and enter details like the
product ID, facility, and quantity again. This is because the requirement
approval screen neither shows the production run nor starts it.
This creates a disconnect between two steps that are closely related: the
component that has been made internally and the finished product that needs to
be produced. This gap leads to delays, mistakes, and inefficiencies—especially
in high-volume operations. To fix this, the system should:
* Automatically create a production run upon requirement approval, applying
the associated Bill of Materials (BOM) and routing.
* Link the production run to the requirement for traceability.
* Display a UI message or log to confirm creation.
These changes will eliminate redundant steps, enhance traceability, and
streamline manufacturing operations.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)