Ian Romanick wrote:
> -----BEGIN PGP SIGNED MESSAGE-----
> Hash: SHA1
> 
> As promised, I'm sending out a proposed release schedule before the 11th
> hour.  Doing a simultaneous x.y.z and x.y+1 release worked out pretty
> well last time, so I propose to do the same thing again.  The RC and
> final dates below are for both 7.7 and 7.6.1.
> 
> The RC1 date is pretty important as it aligns with at least one distro's
> release schedule.
> 
> Create mesa_7_7_branch    11/19
> RC1                       11/30
> RC2                       12/7
> RC3                       12/14
> final                     12/21
> 
> The goal is for RC3 and final to be the identical with the exception of
> version strings and repository tags.

It looks like mesa_7_7_branch has been created a day ahead of 
schedule.  That's OK.

I'd like to propose fast-tracking the 7.6.1 release to minimize the 
time during which we have to worry about having 3 active branches 
(mesa_7_6_branch, mesa_7_7_branch and master).

The 7.6.1 release should be ready to go at any time since it's just 
bug fixes.  So I'd like to make a release candidate today, and release 
7.6.1 by the end of the week.

Any objections?

-Brian

------------------------------------------------------------------------------
Let Crystal Reports handle the reporting - Free Crystal Reports 2008 30-Day 
trial. Simplify your report design, integration and deployment - and focus on 
what you do best, core application coding. Discover what's new with
Crystal Reports now.  http://p.sf.net/sfu/bobj-july
_______________________________________________
Mesa3d-dev mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mesa3d-dev

Reply via email to