On 10 November 2010 07:27, Michael Hope <michael.h...@linaro.org> wrote:
> Hi there.  I've been going through the blueprints in preparation for
> next weeks TSC review.  The top level topics are good, and I'd like to
> have the rest of the engineering blueprints checked over and updated
> to match what we talked about at the summit.

> Peter, there's a whole range of QEMU ones that could do with a pass over.

I've had a look at these and fleshed them out mostly.
There are some oddities:
 * why are maintain-beagle-models and qemu-continuous-integration
   under "tr-toolchain-consolidate-qemu" and not "tr-toolchain-integration" ?
 * should sound-support really be a "Medium" ? I thought we decided at UDS
   that it wasn't all that important

and I haven't worried too much about ones which are clearly far enough
down the list that we're not going to get to them in this six month cycle.

-- PMM

_______________________________________________
linaro-toolchain mailing list
linaro-toolchain@lists.linaro.org
http://lists.linaro.org/mailman/listinfo/linaro-toolchain

Reply via email to