https://bugs.kde.org/show_bug.cgi?id=494811

            Bug ID: 494811
           Summary: Very long assembly time for vertical project
    Classification: Applications
           Product: kdenlive
           Version: 24.08.1
          Platform: Microsoft Windows
                OS: Microsoft Windows
            Status: REPORTED
          Severity: grave
          Priority: NOR
         Component: Rendering & Export
          Assignee: j...@kdenlive.org
          Reporter: virwa...@bk.ru
  Target Milestone: ---

SUMMARY
Very long assembly time for vertical project

STEPS TO REPRODUCE
1. Create Vertical Project 30 fps
2. Insert Clip 11 Minutes
3. Throw a rotation effect there (or insert a clip with a 90-degree rotation
flag)
4. Start Project Assembly

OBSERVED RESULT
There will be a long wait, and then the build time of the project will show 3
days. I tried twice, waited more than a day, the project is moving, but no more
than 10-20 percent per day

EXPECTED RESULT
I would like at least, like with my horizontal video on my NVidia GTX 1080 at a
speed of 1 minute of the project to 4 minutes of assembly or faster. Or, for
example, a 90-degree rotation of the same clip used in a project using Avidemux
runs at 75 frames per second

SOFTWARE/OS VERSIONS
Windows: 10 22H2

ADDITIONAL INFORMATION
I observe that project assembly takes very few resources on my system. My AMD
8500 processor with 32 GB of memory. And, in general, guys, thank you very much
for what you are doing. I am happy to use kdenlive in my work on a non-profit
series

-- 
You are receiving this mail because:
You are watching all bug changes.

Reply via email to