https://bugs.kde.org/show_bug.cgi?id=364318
--- Comment #5 from Wegwerf <wegwerf-1-...@gmx.de> --- More testing reveals that resizing the clip helps, but only if I resize the clip a lot by dragging the end of the clip, then resize it back to its original size. Next, some "careful research" shows that I need to resize the image clip beyond its current length. When loading, you can see the length of the title clip to be 00:00:12:05. The timeline clip instance starts at position 00:00:03:08 and has a length of 00:00:06:00, giving a total(!) length=end of 00:00:09:08. Now, resize the clip in the timeline only one or two seconds: doesn't change the incorrect blurring. Next, resize beyond a right end of 00:00:12:05, that is, a timeline clip length of around 00:00:12:08. Now the animation gets correctly updated, so scrubbing the timeline shows the proper blur ramp-down. -- You are receiving this mail because: You are watching all bug changes.