https://issues.apache.org/bugzilla/show_bug.cgi?id=46677

           Summary: Copying Test Elements between test plans
           Product: JMeter
           Version: 2.3.2
          Platform: PC
        OS/Version: Linux
            Status: NEW
          Severity: enhancement
          Priority: P3
         Component: Main
        AssignedTo: [email protected]
        ReportedBy: [email protected]


I suggest the following enhancements to JMeter to make test element copying
more seamless and more straightforward:

1. Enable test elements to be left in the Workspace between the loading of test
plans, this will allow users to copy elements between test plans.

2. Enable drag & drop and copy/paste between separate instances of JMeter.


-- 
Configure bugmail: https://issues.apache.org/bugzilla/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are the assignee for the bug.

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to