https://issues.apache.org/bugzilla/show_bug.cgi?id=46677
Summary: Copying Test Elements between test plans
Product: JMeter
Version: 2.3.2
Platform: PC
OS/Version: Linux
Status: NEW
Severity: enhancement
Priority: P3
Component: Main
AssignedTo: [email protected]
ReportedBy: [email protected]
I suggest the following enhancements to JMeter to make test element copying
more seamless and more straightforward:
1. Enable test elements to be left in the Workspace between the loading of test
plans, this will allow users to copy elements between test plans.
2. Enable drag & drop and copy/paste between separate instances of JMeter.
--
Configure bugmail: https://issues.apache.org/bugzilla/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are the assignee for the bug.
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]