Dao Le created SUREFIRE-1045:
--------------------------------
Summary: Separate of each test class into 1 suite causes problem
with setUp embedded DBs and testNG dependsOnGroup
Key: SUREFIRE-1045
URL: https://jira.codehaus.org/browse/SUREFIRE-1045
Project: Maven Surefire
Issue Type: Bug
Components: TestNG support
Affects Versions: 2.16
Reporter: Dao Le
There are 2 problems with this approach:
1/ I want to run EmbeddedMongo, it is pretty slow to set up and tear down and
even causes problems when I do this too often. In the old version, everything
is a big suite, so we only need to start it once (using @BeforeSuite) and drop
all the databases before each test method, and then tear down (using
@AfterSuite.) Now this is not possible, and as mention, I can't set up and tear
down on each test class.
2/ For some reason, I want to run testB() of class B after a group of tests in
class A. This is also not possible.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira