[ 
https://issues.apache.org/jira/browse/HBASE-27380?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=18093170#comment-18093170
 ] 

Hudson commented on HBASE-27380:
--------------------------------

Results for branch branch-2
        [build #97 on 
builds.a.o|https://ci-hbase.apache.org/job/HBase-Integration-Test/job/branch-2/97/]:
 (x) *{color:red}-1 overall{color}*
----
details (if available):



(/) {color:green}+1 client integration test for 3.3.5 {color}
(/) {color:green}+1 client integration test for 3.3.5 with shaded hadoop 
client{color}


(/) {color:green}+1 client integration test for 3.3.6 {color}
(/) {color:green}+1 client integration test for 3.3.6 with shaded hadoop 
client{color}


(/) {color:green}+1 client integration test for 3.4.0 {color}
(/) {color:green}+1 client integration test for 3.4.0 with shaded hadoop 
client{color}


(/) {color:green}+1 client integration test for 3.4.2 {color}
(/) {color:green}+1 client integration test for 3.4.2 with shaded hadoop 
client{color}


> RitDuration histogram metric is broken
> --------------------------------------
>
>                 Key: HBASE-27380
>                 URL: https://issues.apache.org/jira/browse/HBASE-27380
>             Project: HBase
>          Issue Type: Bug
>    Affects Versions: 2.5.0, 2.6.0, 3.0.0-beta-1, 4.0.0-alpha-1
>            Reporter: Bryan Beaudreault
>            Assignee: Xiao Liu
>            Priority: Minor
>              Labels: pull-request-available
>             Fix For: 2.7.0, 3.0.0-beta-2, 2.5.16, 2.6.7
>
>
> Looks like the method which updates it in MetricsAssignmentManager, 
> updateRitDuration, got broken somewhere along the way. It's no longer used. 
> We should wire this back up.
> https://github.com/apache/hbase/blob/master/hbase-server/src/main/java/org/apache/hadoop/hbase/master/MetricsAssignmentManager.java#L82



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to