[
https://issues.apache.org/jira/browse/GEODE-10089?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17508965#comment-17508965
]
ASF subversion and git services commented on GEODE-10089:
---------------------------------------------------------
Commit 57696a37e17d3e741659d6e7aee1c0b26aa6b7a2 in geode's branch
refs/heads/develop from Owen Nichols
[ https://gitbox.apache.org/repos/asf?p=geode.git;h=57696a3 ]
GEODE-10089: update release scripts to handle 1.15 (#7406)
* increased RC pipeline file size check limits as 1.15 is a little bigger than
1.14
* modified RC pipeline native builds to obtain a required newer cmake than what
is distributed by Ubuntu
* generate the full releasenotes link to add to the wiki page
* move the dlcdn check to the end of the script since it only blocks sending of
the announce email
* generate better comment on whether the new old version was added or replaced
and why
* do as much as we can that doesn't depend on maven, before waiting on maven
> release 1.15.0
> --------------
>
> Key: GEODE-10089
> URL: https://issues.apache.org/jira/browse/GEODE-10089
> Project: Geode
> Issue Type: Task
> Components: release
> Reporter: Owen Nichols
> Assignee: Owen Nichols
> Priority: Major
> Labels: pull-request-available
>
> As per [Jan 25 dev list
> discussion|https://lists.apache.org/thread/s9mpd207h40crcr76fpdfmohdchgdqog],
> support/1.15 was cut with the intention of stabilizing and releasing a new
> Geode minor.
> Release status information is also updated in the Geode [Release
> Schedule|https://cwiki.apache.org/confluence/display/GEODE/Release+Schedule].
--
This message was sent by Atlassian Jira
(v8.20.1#820001)