[
https://issues.apache.org/jira/browse/GEODE-8657?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Sarah Abbey updated GEODE-8657:
-------------------------------
Description:
https://concourse.apachegeode-ci.info/teams/main/pipelines/apache-develop-main/jobs/AcceptanceTestOpenJDK11/builds/541
http://hydradb.gemfire.pivotal.io/hdb/testresult/8807821
Looking at the above failures, it does not seem like any of the tests hung.
All tests were executed and completed in some fashion (either successfully or
they were skipped). Acceptance tests have 1hr 30min to execute, but it seems
this is not long enough due to a greater number of acceptance tests.
was:
https://concourse.apachegeode-ci.info/teams/main/pipelines/apache-develop-main/jobs/AcceptanceTestOpenJDK11/builds/541
http://hydradb.gemfire.pivotal.io/hdb/testresult/8807821
> Acceptance test timeout
> -----------------------
>
> Key: GEODE-8657
> URL: https://issues.apache.org/jira/browse/GEODE-8657
> Project: Geode
> Issue Type: Bug
> Components: redis, tests
> Reporter: Sarah Abbey
> Assignee: Sarah Abbey
> Priority: Major
>
> https://concourse.apachegeode-ci.info/teams/main/pipelines/apache-develop-main/jobs/AcceptanceTestOpenJDK11/builds/541
> http://hydradb.gemfire.pivotal.io/hdb/testresult/8807821
> Looking at the above failures, it does not seem like any of the tests hung.
> All tests were executed and completed in some fashion (either successfully or
> they were skipped). Acceptance tests have 1hr 30min to execute, but it seems
> this is not long enough due to a greater number of acceptance tests.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)