Joris Melchior created GEODE-7809:
-------------------------------------
Summary: Distributed management operation enhancements
Key: GEODE-7809
URL: https://issues.apache.org/jira/browse/GEODE-7809
Project: Geode
Issue Type: Improvement
Components: management
Reporter: Joris Melchior
Fix For: 1.13.0
Distributed management operations need the following improvements:
* Operations that have no end-date will currently be cleaned up. We should
pick a set time after the start of an operation that the record will have to
live in the Region of record. This way even operations without and end-date
will get cleaned up at some point.
* Currently operations will be cleaned out of the Region of record 2 hours
after completion. This is considered too quick so we need to pick a longer time
period and change it to that. We can also consider making this time
configurable.
* When the locator on which the operation is started disappears for any reason
before the distributed operation has finished the end of the operation will not
be recorded. We should find a way to make sure that we can record an end of an
operation even if the original request locator disappears before the operation
completion. (this assumes that the cluster has more than one locator running)
--
This message was sent by Atlassian Jira
(v8.3.4#803005)