On 03/11/2017 11:23 PM, Andrew Savchenko wrote:
> While the Deputy may be assigned, this still gives all power to
> single hands. Maybe it will be better to establish something like
> the Security Project Council (SPC)? E.g. three project members may
> be elected to this SPC, so that all serious decisions will require
> some team agreement from at least 2 SPC members. This way the
> Deputy will not be needed as well.

Something like this has been discussed. I personally don't like the
approach too much given that it adds a certain degree of bureaucracy and
can remove responsibility. An important part of the GLEP is that the
project lead is responsible to the council for the changes that is made.
Having possibility to overrule that by members would mean that the lead
is not able to control the action, and as such, can't be responsible for
it. If the members disagree with the lead they can call for re-election
as per GLEP:39 already.

As discussed in another sub-thread, however, will try to incorporate
more of the procedure in the vulnerability treatment policy etc into the
GLEP such that procedures are more in focus.

-- 
Kristian Fiskerstrand
OpenPGP keyblock reachable at hkp://pool.sks-keyservers.net
fpr:94CB AFDD 3034 5109 5618 35AA 0B7F 8B60 E3ED FAE3

Attachment: signature.asc
Description: OpenPGP digital signature

Reply via email to