Roy Golan has submitted this change and it was merged. Change subject: core: Extend the lapse of timeout ......................................................................
core: Extend the lapse of timeout The unit-test fails selectively when trying to validate the expiration time of a specific value. The value is set with time of the system and compared to another call for that system time. The suspicious is that the second call might return a lower time than the first one, as there is no contract for accuracy. The solution is to increase the lapse of timeout. Change-Id: I330a9b1ff5c20b0885f262943d1fe2107f8da7c7 Signed-off-by: Moti Asayag <masa...@redhat.com> --- M backend/manager/modules/dal/src/test/java/org/ovirt/engine/core/dal/dbbroker/auditloghandling/TimeoutBaseTest.java 1 file changed, 1 insertion(+), 1 deletion(-) Approvals: Roy Golan: Looks good to me, approved Moti Asayag: Verified -- To view, visit http://gerrit.ovirt.org/6376 To unsubscribe, visit http://gerrit.ovirt.org/settings Gerrit-MessageType: merged Gerrit-Change-Id: I330a9b1ff5c20b0885f262943d1fe2107f8da7c7 Gerrit-PatchSet: 1 Gerrit-Project: ovirt-engine Gerrit-Branch: master Gerrit-Owner: Moti Asayag <masa...@redhat.com> Gerrit-Reviewer: Moti Asayag <masa...@redhat.com> Gerrit-Reviewer: Roy Golan <rgo...@redhat.com> _______________________________________________ Engine-patches mailing list Engine-patches@ovirt.org http://lists.ovirt.org/mailman/listinfo/engine-patches