This outage has been cancelled for the time being. A new ticket and
announcement will be created when it has been rescheduled.

On 7 May 2018 at 13:02, Stephen John Smoogen <[email protected]> wrote:
> Planned Outage - Server updates - 2018-05-09 12:00 UTC
>
> There will be an outage starting at 2018-05-09 12:00 UTC,
> which will last approximately 4 hours.
>
> To convert UTC to your local time, take a look at
> http://fedoraproject.org/wiki/Infrastructure/UTCHowto
> or run:
>
> date -d '2018-05-09 12:00UTC'
>
> Reason for outage:
>
> Ibiblio is moving systems to a newer rack with 10G SFP+ networks.
> Systems will need to be powered down, moved over to the new racks,
> powered back up, configured to use the new networks in failover mode.
>
> Affected Services:
>
> download-ib01.fedoraproject.org
> pagure-proxy01.fedoraproject.org
> proxy04.fedoraproject.org
> noc02.fedoraproject.org
> unbound-ib01.fedoraproject.org
> ns02.fedoraproject.org
> people02.fedoraproject.org
> proxy12.fedoraproject.org
> smtp-mm-ib01.fedoraproject.org
> torrent02.fedoraproject.org
>
> Torrent and people will be down during that time. Systems configured
> to use download-ib02 will also be.
>
> Ticket Link:
>
> https://pagure.io/fedora-infrastructure/issue/6915
>
> Please join #fedora-admin or #fedora-noc on irc.freenode.net
> or add comments to the ticket for this outage above.
>
> --
> Stephen J Smoogen.



-- 
Stephen J Smoogen.
_______________________________________________
devel mailing list -- [email protected]
To unsubscribe send an email to [email protected]

Reply via email to