[
https://issues.apache.org/jira/browse/TUBEMQ-526?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Guocheng Zhang reassigned TUBEMQ-526:
-------------------------------------
Assignee: Guocheng Zhang
> Adjust the packaging script and version check list, remove the "-WIP" tag
> -------------------------------------------------------------------------
>
> Key: TUBEMQ-526
> URL: https://issues.apache.org/jira/browse/TUBEMQ-526
> Project: Apache TubeMQ
> Issue Type: Bug
> Reporter: Guocheng Zhang
> Assignee: Guocheng Zhang
> Priority: Major
>
> Starting from version 0.8.0(issue:TUBEMQ-505), the DISCLAIMER file has
> removed the -WIP tag, so related packaging and the file with the same name in
> the version verification check list need to be modified accordingly.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)