+1 for Jinwoo becoming the release manager! Great to see the momentum here…

I can help out with any ad hoc testing, as needed.

Thanks,
Nitin

On Sat, Aug 30, 2025 at 7:00 PM Charlie Black <[email protected]>
wrote:

> Long time Geode user - just tuning in on this thread.
>
> This is awesome and I am looking forward to helping out where I can. I do
> have a commit or two in the code base - I never became an Apache
> Contributor.
>
> I don't think we need more feedback on the release manager - but here is my
> +1 for Jinwoo becoming a release manager.
>
> Charlie
>
> On Sat, Aug 30, 2025 at 12:38 AM Niall Pemberton <
> [email protected]>
> wrote:
>
> > +1 for Jinwoo as Release Manager
> >
> > Niall
> >
> > On Sat, 30 Aug 2025 at 01:48, Kirk Lund <[email protected]> wrote:
> > >
> > > Thanks Jinwoo for stepping up.
> > >
> > > +1 from me as mentioned earlier. In the interests of getting Apache
> Geode
> > > jump-started and generating some positive inertia, let’s give this
> > DISCUSS
> > > thread until *Monday*. If there are no other volunteers or objections
> by
> > > then, we should consider Jinwoo confirmed as RM for 1.15.2.
> > >
> > > That will satisfy the ASF minimum time for confirming a volunteer for
> RM,
> > > which is at least 72 hours.
> > >
> > > Looking ahead, I suggest that DISCUSS threads, including those for RM
> > > volunteers, should ideally remain open for 3 to 5 days during the work
> > > week. That is the ASF ideal. For this case we are applying the 72-hour
> > > minimum in order to keep things moving, but in the future giving a bit
> > more
> > > time should strike a better balance between thoroughness and momentum.
> > >
> > > Once again, thanks to Jinwoo for volunteering to take this on.
> > >
> > > PS: As a committer you should already have most of the required
> > > permissions, but we will use this release as a way to confirm. Going
> > > through it will also give us the opportunity to update the “*Release
> > Apache
> > > Geode*” page on Confluence so that it reflects the current
> infrastructure
> > > and process.
> > >
> > > On Fri, Aug 29, 2025 at 1:38 PM Kirk Lund <[email protected]> wrote:
> > >
> > > > +1 to having Jinwoo become the Release Manager for Apache Geode
> 1.15.2.
> > > >
> > > > I think it's preferable to have someone take on this role who is
> > committed
> > > > to a longer term and more full time presence on the project so that
> > they
> > > > can then help guide the volunteer for the next release.
> > > >
> > > > On Fri, Aug 29, 2025 at 11:38 AM Jinwoo Hwang
> > <[email protected]>
> > > > wrote:
> > > >
> > > >> Hi all,
> > > >>
> > > >> As we begin preparations for the Apache Geode 1.15.2 release, I’d
> > like to
> > > >> kindly open the floor for volunteers interested in serving as
> Release
> > > >> Manager (RM).
> > > >>
> > > >> If you feel inclined to take on this role, please don’t hesitate to
> > reply
> > > >> to this thread. Should multiple individuals express interest, we’ll
> > > >> coordinate to designate a primary RM and optionally a shadow RM to
> > support
> > > >> the process.
> > > >>
> > > >> Your willingness to contribute is greatly appreciated, and I look
> > forward
> > > >> to hearing from those interested.
> > > >>
> > > >>
> > > >> Best regards,
> > > >>
> > > >> Jinwoo Hwang (he/him/his)
> > > >>
> > > >>
> > > >>
> > > >> SAS® Research and Development
> > > >>
> > > >> http://JinwooHwang.com<http://jinwoohwang.com/>
> > > >>
> > > >>
> > > >>
> >
>

Reply via email to