On Wed, Dec 3, 2025 at 1:02 PM Jaydeep Chovatia
<[email protected]> wrote:
> One of the practices we follow locally is to perform a two-step rollout: the 
> first cut includes only schema changes, and the second includes the feature. 
> That way, we can safely roll back the feature without worrying about backward 
> compatibility.

You will still be locked to the version you upgraded to though, since
downgrading will throw exceptions on the now modified schema.  If
someone discovers a regression after upgrading, they will be stuck.

Kind Regards,
Brandon

Reply via email to