On Wed, Dec 3, 2025 at 1:02 PM Jaydeep Chovatia <[email protected]> wrote: > One of the practices we follow locally is to perform a two-step rollout: the > first cut includes only schema changes, and the second includes the feature. > That way, we can safely roll back the feature without worrying about backward > compatibility.
You will still be locked to the version you upgraded to though, since downgrading will throw exceptions on the now modified schema. If someone discovers a regression after upgrading, they will be stuck. Kind Regards, Brandon
