Hi, Am Thu, Jul 06, 2023 at 08:28:45PM +0200 schrieb Paul Gevers: > On 06-07-2023 19:08, Paul Gevers wrote: > > Yes, we'll take care of that where it looks sane to do so (examples of > > that are r-cran-epi); I'll manually schedule the "combined" tests, such > > that they disappear from the excuses if they then pass. > > I'm seeing in several tests where things seem to work when r-cran-tibble ^^^^ > from unstable is involved and fail if the version from unstable is used; ^^^^^^^^ ^^^^ ^^^^^^^^
Are you sure there is no typo in your sentence? At least I fail to understand. I assume the latter "unstable" should be "testing", right? > e.g. here: https://ci.debian.net/packages/r/r-cran-rsample/testing/amd64/ I can only say that tibble is used by a lot of packages directly as dependency (69 in my locally stored repositories - may be some more). In addition there are further dependencies of higher order. > Is there something special about r-cran-tibble? It didn't grow a dependency > on r-graphics-engine according to > https://buildd.debian.org/status/fetch.php?pkg=r-cran-tibble&arch=amd64&ver=3.2.1%2Bdfsg-2&stamp=1688629916&raw=0 > so it doesn't seem to be involved in that part of the discussion. I confirm it shouldn't be involved into the r-graphics-engine issue. May be there is some other "hidden" transition needed which is connected to some interface of tibble? Dirk, can you shed some light into this? Kind regards Andreas. -- http://fam-tille.de