Package: presage
Version: 0.8.7-2
Severity: normal
Tags: patch pending

Dear maintainer,

I've prepared an NMU for presage (versioned as 0.8.7-2.1) and
uploaded it to DELAYED/2. Please feel free to tell me if I
should delay it longer.

The delay I'm setting is short for fixing the build on armel (tried
3 times on buildd with no luck), which is preventing the package
migrate to testing. The patch is straightforward and
self-explaining.



--
Regards,
Aron Xu

Attachment: presage-0.8.7-2.1-nmu.diff
Description: Binary data

Reply via email to