     new 1e0c7d5fe HDDS-14261. [Website v2] [Docs] [Administrator Guide] 
Upgrade and Downgrade (#211)
1e0c7d5fe is described below

commit 1e0c7d5fe677eaa24cffd567c8dfbd0e272c82c4
Author: Eric C. Ho <[email protected]>
AuthorDate: Thu Jan 8 09:23:37 2026 +0800

    HDDS-14261. [Website v2] [Docs] [Administrator Guide] Upgrade and Downgrade 
(#211)
---
 .../03-operations/02-upgrade-and-downgrade.md      | 81 +++++++++++++++++++++-
 1 file changed, 80 insertions(+), 1 deletion(-)

diff --git 
a/docs/05-administrator-guide/03-operations/02-upgrade-and-downgrade.md 
b/docs/05-administrator-guide/03-operations/02-upgrade-and-downgrade.md
index 1354277f7..2f57cd38a 100644
--- a/docs/05-administrator-guide/03-operations/02-upgrade-and-downgrade.md
+++ b/docs/05-administrator-guide/03-operations/02-upgrade-and-downgrade.md
@@ -1,3 +1,82 @@
+---
+sidebar_label: Upgrade and Downgrade
+---
+
 # Upgrade and Downgrade
 
-**TODO:** File a subtask under 
[HDDS-9859](https://issues.apache.org/jira/browse/HDDS-9859) and complete this 
page or section.
+Ozone supports non-rolling upgrades and downgrades, where all components are 
stopped first, and then restarted with the upgraded or downgraded versions.
+
+## Upgrade States
+
+After upgrading components, the upgrade process is divided into two states:
+
+1. **Pre-finalized**: When the current components are stopped and the new 
versions are started, they will see that the data on disk was written by a 
previous version of Ozone and enter a pre-finalized state. In the pre-finalized 
state:
+    - The cluster can be downgraded at any time by stopping all components and 
restarting with the old versions.
+    - Backwards incompatible features introduced in the new version will be 
disallowed by the cluster.
+    - The cluster will remain fully operational with all functionality present 
in the old version still allowed.
+    - Any data created while pre-finalized will remain readable after 
downgrade.
+
+2. **Finalized**: When a finalize command is given to OM or SCM, they will 
enter a finalized state.  In the finalized state:
+    - The cluster can no longer be downgraded.
+    - All new features of the cluster introduced in the new version can be 
used.
+
+### Querying finalization status
+
+**OM**: `ozone admin om finalizationstatus`. If using OM HA, finalization 
status is checked for the quorum, not individual OMs.
+
+**SCM**: `ozone admin scm finalizationstatus`. SCM will report that 
finalization is complete once it has finalized and is aware of enough finalized 
Datanodes to form a write pipeline. The remaining Datanodes will finalize 
asynchronously and be incorporated into write pipelines after informing SCM 
that they have finalized.
+
+**Datanodes**: `ozone admin datanode list` will list all Datanodes and their 
health state as seen by SCM. If SCM is finalized, then Datanodes whose health 
state is `HEALTHY` have informed SCM that they have finalized. Datanodes whose 
health state is `HEALTHY_READONLY` have not yet informed SCM that they have 
finished finalization. `HEALTHY_READONLY` (pre-finalized) Datanodes remain 
readable, so the cluster is operational even if some otherwise healthy 
Datanodes have not yet finalized. `S [...]
+
+## Steps to upgrade and downgrade
+
+Starting with your current version of Ozone, complete the following steps to 
upgrade to a newer version of Ozone.
+
+1. If using OM HA and currently running Ozone 1.2.0 or greater, prepare the 
Ozone Manager. If OM HA is not being used, this step can be skipped.
+
+    ```bash
+    ozone admin om prepare -id=<om-sevice-id>
+    ```
+
+    The `prepare` command will block the Ozone Managers from receiving all 
write requests. See [Ozone Manager Prepare For 
Upgrade](https://ozone.apache.org/docs/edge/design/omprepare.html) for more 
information
+
+2. Stop all components.
+
+3. Replace artifacts of all components with the newer versions.
+
+4. Start the components
+    1. Start the SCM and Datanodes as usual:
+
+        ```bash
+        ozone --daemon start scm
+        ozone --daemon start datanode
+        ```
+
+    2. Start the Ozone Manager using the `--upgrade` flag to take it out of 
prepare mode.
+
+        ```bash
+        ozone --daemon start om --upgrade
+        ```
+
+        - There also exists a `--downgrade` flag which is an alias of 
`--upgrade`. The name used does not matter.
+        - **IMPORTANT**: All OMs must be started with the `--upgrade`  or 
`--downgrade` flag in this step. If some of the OMs are not started with this 
flag by mistake, run `ozone admin om cancelprepare -id=<om-sevice-id>` to make 
sure all OMs leave prepare mode.
+
+    At this point, the cluster is upgraded to a pre-finalized state and fully 
operational. The cluster can be downgraded by repeating the above steps, but 
restoring the older versions of components in step 3, instead of the newer 
versions. To finalize the cluster to use new features, continue on with the 
following steps.
+
+    **Once the following steps are performed, downgrading will not be 
possible.**
+
+5. Finalize SCM
+
+    ```bash
+    ozone admin scm finalizeupgrade
+    ```
+
+    At this point, SCM will tell all of the Datanodes to finalize. Once SCM 
has finalized enough Datanodes to form a write pipeline, it will return that 
finalization was successful. The remaining pre-finalized Datanodes will be in a 
read-only state until they indicate to SCM that they have finalized. Write 
requests will be directed to finalized Datanodes only.
+
+6. Finalize OM
+
+    ```bash
+    ozone admin om finalizeupgrade -id=<om-service-id>
+    ```
+
+At this point, the cluster is finalized and the upgrade is complete.


---------------------------------------------------------------------