GitHub user honkerjha created a discussion: How to skip missed scheduled tasks after restart in DolphinScheduler 3.3.2
Apache DolphinScheduler 3.3.2: After I shut down the DolphinScheduler service for a period of time and restart it, the system will automatically execute all scheduled tasks that were not triggered during the shutdown. For tasks that compute based on the latest daily data, this will cause duplicate calculations. I do not want this behavior; I want the scheduler to skip all missed tasks instead of running them. How can I configure this? GitHub link: https://github.com/apache/dolphinscheduler/discussions/17974 ---- This is an automatically sent email for [email protected]. To unsubscribe, please send an email to: [email protected]
