Hello Carlo,
Yes. You can have a "Next Pool" directive configured for being used by your
copy job. This way, you can configure the pool for 30 days retention:
Job {
Name = OriginalJob
Type = Backup
...
Pool = OriginalPool
}
Pool {
Name = OriginalPool
Pool Type = Backup
Retention Period = 7 days
...
Next Pool = DestinationPool
}
Pool {
Name = DestinationPool
Pool Type = Backup
Retention Period = 30 days
}
Job {
Name = CopyJob
Type = Copy
Pool = OriginalPool
...
}
Best regards,
Ana
On Tue, Sep 22, 2015 at 8:00 AM, Carlo Filippetto <
[email protected]> wrote:
> Hi,
> Noone have idea if the copy job can have a retention bigger that the
> original volumes?
> I have to modify it from "Update" command in bconsole?
>
> Thank you
>
>
>
> 2015-09-21 16:33 GMT+02:00 Carlo Filippetto <[email protected]>:
>
>> Hi all
>>
>> I would like to modify my backup strategy: it is possible to use Copy Job
>> as Weekly Job?
>>
>> I'll explain:
>> I need to make every day incremental, to move this volumes outside for
>> restore in second site, but I can't use 30 Volumes, to cover all the month.
>> Can I use 7 daily volumes and every Sunday make a Copy of the last Volumes
>> (with retention 30days) and let them leave for a month?
>>
>> Thank you
>>
>>
>>
>
>
> ------------------------------------------------------------------------------
>
> _______________________________________________
> Bacula-users mailing list
> [email protected]
> https://lists.sourceforge.net/lists/listinfo/bacula-users
>
>
------------------------------------------------------------------------------
_______________________________________________
Bacula-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/bacula-users