Hi all,
I've got a new installation using 1.38.6 interfacing with a 3-drive
changer. The initially-scheduled jobs are incrementals that, when
run, are rightfully automatically upgraded to full backups. Only
problem is that once the jobs run, they've already reserved a tape
from the incremental pool, and the director doesn't bother ejecting
in favor of a tape from the full pool. Jobs run as Full backups
correctly use the "Fulls" pool.
Is this a known issue that I need to address using a different
configuration? Or a bug?
Many thanks for any ideas --
Ian
Relevant config:
-----------------------------
JobDefs {
Name = "DefaultJob"
Type = Backup
Level = Full
Pool = Fulls
...
}
Job {
Name = "CRYSTAL_HOME"
JobDefs = "DefaultJob"
Client = home-fd
FileSet = "CRYSTAL_HOME"
Schedule = "CRYSTAL_HOME"
Prefer Mounted Volumes = no
}
FileSet {
Name = "CRYSTAL_HOME"
Include {
Options {
signature = MD5
onefs = no
}
File = /home
}
Exclude {
}
}
Schedule {
Name = "CRYSTAL_HOME"
Run = Full Pool=Fulls on 3 at 22:00
Run = Differential Pool=Fulls on fri at 1:00
Run = Incremental Pool=Incrementals mon-thu at 1:00
}
-------------------------------------------------------
This SF.Net email is sponsored by xPML, a groundbreaking scripting language
that extends applications into web and mobile media. Attend the live webcast
and join the prime developer group breaking into this new coding territory!
http://sel.as-us.falkag.net/sel?cmd=lnk&kid=110944&bid=241720&dat=121642
_______________________________________________
Bacula-users mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/bacula-users