Am 17.10.2017 um 10:57 schrieb Nicolai Hähnle:
On 13.10.2017 10:46, Liu, Monk wrote:
Just revert Nicolai’s patch,if other routine want to reference
s_fence, it should get the finished fence in the first place/time,
For gpu_reset routine, it refers to s_fence only on those unfinished
job in sched_hw_job_reset, so totally safe to refer to s_fence pointer
I wonder what issue Nicolai met with and submitted this patch
The original motivation of my patch was to catch accidental use of
job->s_fence after the fence was destroyed in amd_sched_process_job.
Basically, prevent a dangling pointer. I still think that's a
reasonable idea, though clearly my first attempt at it was just wrong.
It was very reasonable that you pointed out the problem, it's just that
the solution to set it to NULL was wrong.
Instead we should just have increased the lifetime of the reference.
In Christian's v2 patch, it might make sense to add
spin_unlock(&sched->job_list_lock);
+ dma_fence_put(&s_job->s_fence->finished);
+ s_job->s_fence = NULL;
sched->ops->free_job(s_job);
... though I'm not 100% certain about how the fence lifetimes work.
That's a bit pointless because sched->ops->free_job() will free s_job as
the next thing we do here.
Regards,
Christian.
Cheers,
Nicolai
BR Monk
*From:*amd-gfx [mailto:[email protected]] *On
Behalf Of *Liu, Monk
*Sent:* 2017年10月13日16:40
*To:* Koenig, Christian <[email protected]>; Nicolai Hähnle
<[email protected]>; [email protected]
*Subject:* RE: regression with d6c650c0a8f6f671e49553725e1db541376d95f2
I doubt it would always work fine…
First, we have FENCE_TRACE reference s_fence->finished after
“fence_signal(&fence->finished)”
Second, we have trace_amd_sched_proess_job(s_fence) after
“amd_sched_fence_finished()”,
If you put the finished before free_job() and by coincidence the
job_finish() get very soon executed you’ll have odds to hit wild
pointer on above two cases
BR Monk
*From:*Koenig, Christian
*Sent:* 2017年10月13日16:17
*To:* Liu, Monk <[email protected] <mailto:[email protected]>>; Nicolai
Hähnle <[email protected] <mailto:[email protected]>>;
[email protected] <mailto:[email protected]>
*Subject:* Re: regression with d6c650c0a8f6f671e49553725e1db541376d95f2
Yeah, that change is actually incorrect and should be reverted.
What we really need to do is remove dropping sched_job->s_fence from
amd_sched_process_job() into amd_sched_job_finish() directly before
the call to free_job().
Regards,
Christian.
Am 13.10.2017 um 09:24 schrieb Liu, Monk:
commit d6c650c0a8f6f671e49553725e1db541376d95f2
Author: Nicolai Hähnle <[email protected]>
<mailto:[email protected]>
@@ -611,6 +611,10 @@ static int amd_sched_main(void *param)
fence = sched->ops->run_job(sched_job);
amd_sched_fence_scheduled(s_fence);
+
+ /* amd_sched_process_job drops the job's reference
of the fence. */
+ sched_job->s_fence = NULL;
+
if (fence) {
s_fence->parent = dma_fence_get(fence);
r = dma_fence_add_callback(fence,
&s_fence->cb,
Hi Nicolai
with this patch, you will break
"amdgpu_sched_hw_job_reset()"routine:
void
amd_sched_hw_job_reset(structamd_gpu_scheduler
*sched)
{
structamd_sched_job
*s_job;
spin_lock(&sched->job_list_lock);
list_for_each_entry_reverse(s_job,
&sched->ring_mirror_list, node) {
if(s_job->s_fence->parent
&&
fence_remove_callback(s_job->s_fence->parent,
&s_job->s_fence->cb))
{
fence_put(s_job->s_fence->parent);
s_job->s_fence->parent
=
NULL;
atomic_dec(&sched->hw_rq_count);
}
}
spin_unlock(&sched->job_list_lock);
}
see that without sched_job->s_fence, you cannot remove the callback
from its hw fence,
any idea??
BR Monk